A mine has a tailings facility under GISTM scrutiny, a comminution circuit whose downtime costs six figures an hour, and a life-of-mine horizon that makes half the standard renewal logic wrong.

Who this is for

Three people, one budget argument

👷

Reliability engineer

Owns the plan and answers for it. Everything on screen is built to make that week easier.

💷

Tailings engineer of record

Holds the budget line and carries the valuation. Cares about defensibility before features.

🏛️

General manager, operations

Signs, and is the one asked the awkward question in public. Needs one page, not a tour.

Asset classes

What AIPP scores in this industry

Tailings Storage Fixed Plant Comminution Conveyors Bulk Mine Mobile Fleet Haul Roads
📐

Configured for this industry out of the box: condition on the IIMM_1_5 scale, the MINING weighting profile, budget shown as Sustaining capital, capped at life-of-mine, and the instruments it answers to (GISTM, ANCOLD, ICOLD, NORSOK_Z008, ISO14224) named on every score. All of it is yours to change — the weights are sliders, not our opinion.

The honest bit

6 of 30 assets will not score

That is the demo register for this industry, and the gaps are deliberate. AIPP refuses to rank an asset the evidence does not support — it will not apply a curve, a zero or a middle grade to a thing nobody has inspected. 20% of this register comes back unranked, with the reason named.

6 of 30 assets carry NO condition evidence and NO age. That is deliberate. A demo register where everything scores teaches a prospect nothing about what happens to the two-thirds of their own register that will not — and it is exactly where most tools quietly invent a zero. Open the demo on these.

How it runs

From export to defensible programme

01

Tailings load with their consequence classification; fixed plant loads with operating hours and breakdown history.

02

Safety and licence-to-operate outweigh service — a tailings failure is not a service event.

03

Life-of-mine caps the horizon: an asset with eight years of mine left is not renewed on a thirty-year cycle.

04

Sustaining capital constrains the programme; the optimiser respects the shutdown calendar.

05

The pack separates statutory obligations from discretionary spend, because they are not the same argument.

What you will see

The screens that matter here

The horizon that changes everythingSet the mine life to eight years. Watch the renewal logic change — a thirty-year replacement on an asset with eight years of ore behind it is a write-off, and most asset tools will still recommend it.
Tailings sit outside the trade-offThese are not competing for capital on a risk-per-dollar basis. GISTM obligations are a floor, and the pack shows them as a floor rather than as line items that lost to a conveyor.
Downtime is the consequenceFor the circuit, consequence is production. This mill ranks first because of what an unplanned outage costs per hour, not because of its condition grade.
Controls on the tailings bowtieThreats, barriers, consequences. Your engineer of record will recognise this shape. What they will test is whether unverified barriers earn credit — they do not.
What we do not doAnd plainly: we do not compute GISTM conformance and we do not run a breach analysis. We carry the consequence classification and the review cadence as content. If somebody tells you their software makes you GISTM-conformant, ask them the same question.

Fair questions

What this industry actually asks us

Does this replace our EAM?

No. It reads from it. AIPP is the investment decision layer; the EAM stays the system of record for work.

Our criticality is already assessed under NORSOK Z-008.

Then use it — Z-008 ships as a criteria pack and your existing classification loads straight in as consequence.

Can it do FMECA?

No, and that is written into the standards registry as a declared gap. AIPP reasons about assets and controls, not failure modes.

Run it on your own worst class